Aylesbury Transport Study-Report of Existing Condtns (Sept 2005) | This report shows the findings of surveys relating to transport conditions in Aylesbury town in 2005 | 12MB
56Kbps Modem: 29 Minutes Broadband : 3 Minutes 15 Seconds | 
|
Aylesbury Transport Study-Illustrative Scenarios- (May 2006) | This technical note outlines the results of using illustrative scenarios for the Aylesbury area to test the model. | 884KB
56Kbps Modem: 2 Minutes 8 Seconds Broadband : Less than 1 Minute | 
|
Aylesbury Transport Study-TN2-Revised 2026 Scenarios(Nov 2006) | This technical note explains the use of the model to test the effect of three scenarios based on the options identified for the consultation on the core strategy and Aylesbury allocated sites issues and options, and the results of the tests. | 197KB
56Kbps Modem: Less than 1 Minute Broadband : Less than 1 Minute | 
|
AVLDF ALUTS Model-Statement of Findings - April 2007 (TN3) | This note summarises the results of a third stage of transport model testing for spatial development options around Aylesbury, including developer promoted alternative sites. The note is produced as part of the evidence base informing the preferred options stage of the Aylesbury Vale LDF core strategy and Aylesbury allocated sites DPD''s. | 128KB
56Kbps Modem: Less than 1 Minute Broadband : Less than 1 Minute | 
|
Aylesbury Local Development Framework TN4 Scenario Tests (August 2008) | The options tested in this note include growth for Aylesbury in a generally eastern direction, growth in a generally southern direction, and a combined option taking elements from both the southern and eastern options. | 971KB
56Kbps Modem: 2 Minutes 21 Seconds Broadband : Less than 1 Minute | 
|
AVLDF Aylesbury Transport Study-Impact of AVLDF on HA Network | This technical note provides Aylesbury transport model information on the impact of the major developments proposed in the town, on the Highways Agency network (trunk roads and motorways). | 1.2MB
56Kbps Modem: 2 Minutes 56 Seconds Broadband : Less than 1 Minute | 
|
Transport modelling note | This report summarises the transport modelling results comparing the three options for growth at Aylesbury | 171KB
56Kbps Modem: Less than 1 Minute Broadband : Less than 1 Minute | 
|
Aylesbury Vale Rest of District Transport Strategy Draft Officer Report (March 2009) | This document sets out BCC's transport strategy for the rest of district, excluding the Aylesbury urban area. | 2.8MB
56Kbps Modem: 6 Minutes Broadband : Less than 1 Minute | 
|
Towards 2026 - A Transport Strategy for Aylesbury-Draft Officer Report (March 2009) | Updates the final draft of September 2008 and sets out the transport strategy for Aylesbury based on BCC's Local Transport Plan 2 and developed to support planned growth at the town to 2026. | 1.4MB
56Kbps Modem: 3 Minutes 28 Seconds Broadband : Less than 1 Minute | 
|
Aylesbury Transport Strategy 2008-2026 Evidence Base Draft Officer Report (October 2008) | Sets out the background to and rationale for the document Towards 2026 - A Transport Strategy for Aylesbury Draft Officer Report (March 2009) | 5.5MB
56Kbps Modem: 13 Minutes Broadband : 1 Minute 29 Seconds | 
|
Technical Note- Impact of the Aylesbury LDF on the HA Network (September 2009) | | 1.6MB
56Kbps Modem: 4 Minutes no Seconds Broadband : Less than 1 Minute | 
|
Technical Note 5 Halcrow (December 2009) | | 246KB
56Kbps Modem: Less than 1 Minute Broadband : Less than 1 Minute | 
|
Technical Note 6 Halcrow (January 2010) | | 75KB
56Kbps Modem: Less than 1 Minute Broadband : Less than 1 Minute | 
|
Technical Note 7 Halcrow (January 2010) | | 1.2MB
56Kbps Modem: 3 Minutes 6 Seconds Broadband : Less than 1 Minute | 
|
Transport Strategy leaflet 2008 | | 2.6MB
56Kbps Modem: 6 Minutes Broadband : Less than 1 Minute | 
|
Local Transport Plan Volume 1 2000/01 – 2004/05 | | 1.7MB
56Kbps Modem: 4 Minutes 19 Seconds Broadband : Less than 1 Minute | 
|